How to work out the line speed you actually need
Most buyers start from a machine spec and work backwards. It is faster the other way: start from what you have to ship, divide by the hours, and let the arithmetic choose the machine.
The formula
Cans per minute equals your shift output divided by the productive minutes in a shift. Productive minutes are not the clock minutes: a line stops for changeovers, refills, cleaning and breakdowns, so the planning figure is usually 80–85% of the shift.
| Your input | Example A | Example B |
|---|---|---|
| Cans per shift | 10,000 | 50,000 |
| Shift length | 8 hours | 8 hours |
| Planning efficiency | 85% | 85% |
| Productive minutes | 408 | 408 |
| Required output | ≈ 25 cans/min | ≈ 123 cans/min |
| What that implies | Single stations, operator-loaded, is enough | Above the two-unit high-speed line at 120 cans/min — either add a second line or extend the shift |
Where the head count comes from
A filling head doses one can per cycle, so heads are the multiplier on output. The published top figure here, 120 cans per minute, is reached by running two parallel filling units on one frame — which is why the high-speed line carries two. Below that, the same stations run with fewer heads at a lower rate.
Three numbers buyers forget
- Changeover time. If you run three can sizes a week, the changeover hours come straight out of the 85%.
- Peak season. A line sized for the yearly average will be short in the two months that pay for the year.
- Reject rate. Output is good cans, not filled cans; a checkweigher that rejects 2% is doing its job.