One station or a whole line: how to phase the purchase
A line is nine stations on one conveyor. Most factories do not buy nine at once, and should not. The question is which station to add next, and whether the frame you buy now can carry it.
Find the bottleneck first
Walk the existing process and time each step. The station with the longest cycle, or the one that forces a batch to wait, is the one to automate. Buying a fast filler behind a slow capper moves the queue, it does not remove it.
What to check before adding a station to an existing line
- Conveyor height and can spacing — a station built for a different pitch will not sit in your line.
- Control interface — can the new unit be interlocked with what is already there, or does it need its own start button?
- Air and power at that point — a gassing station draws far more air than a capper.
- Direction of flow — stations are handed; a unit built for left-to-right does not reverse.
- Floor space for the operator, not just for the machine.
Buy the frame you will need in three years
The cheapest mistake to avoid is buying a frame that cannot take the next station. If the plan is to add gassing within two years, buy the conveyor length and the control cabinet for it now; retrofitting both later costs more than the difference at order stage.